(The Center Square) – A new gangway was installed on Sapelo Island, where seven people died after a dock collapse in October. The new gangway at the Marsh Landing Dock is 91 feet long, eight feet wide, and engineered and manufactured to a maximum live load of 260 persons, or 52,000 pounds, according to a […]
The post Site of Sapelo Ferry Island dock collapse gets new gangways appeared first on The Black Chronicle.