CARIBPR WIRE, HELSINKI, Finland, April 26, 2022: The technology group Wärtsilä has been awarded the contract to supply and install a 46 MW dual-fuel power plant to the Caribbean Island of Antigua. The engineering, procurement and construction (EPC) order was placed by Antigua Power Company Limited (APCL), an independent power producer. The order was entered into Wärtsilä’s order book in January 2022. The plant will operate primarily on regasified liquefied natural gas (LNG). The project combines a power plant and […]