[Tunis Afrique Presse] Tunis/Tunisia -- The Tunisian Electricity and Gas Company (STEG) dedicated during the last summer season, 4 power plants with a 450 megawatts capacity each, to meet the increased demand for electric power, due to the growing domestic use of air conditioners.