With the pipelines that form part of the massive proposed US$900 million gas-to-energy project having the capability to transport up to 120 million standard cubic feet per day (MMSCFD) of gas from Liza Phase 1 and Liza Phase 2 FPSOs, studies are being done to consider alternative uses of the natural gas.
The article Studies underway for alternative uses of gas from Liza-1 well appeared first on Stabroek News.