The Barbados Water Authority (BWA) has advised customers that work will resume at the Hampton Pumping Station in St Philip on Tuesday. Crews will tackle the removal and replacement of the old support beams on the other side of the structure which support the remaining two (2) pumps in the well. The Station will remain […]
The post Repair work to resume at BWA Hampton Station on Tuesday appeared first on Barbados Today.